Blog
Congo Kinshasa Photovoltaic Energy Storage Procurement Announcement
1、 Collaboration mode
The supplier provides a complete set of export qualifications and local compliance certification in the Democratic Republic of Congo. After passing the audit, a formal procurement contract will be signed;
Settlement method: bank settlement;
Delivery location: Qingdao, China (designated warehouse/port);
The export procedures, FERI electronic tracking sheet, BIVAC pre shipment inspection, OCC certification, UN38.3/MSDS and other customs clearance and transportation documents shall be fully handled by the supplier to ensure compliant customs clearance.
2、 Procurement requirements (civil/infrastructure/off grid power supply)
1. Procurement scope
Product: Large brand photovoltaic energy storage system (off grid/microgrid type, suitable for high temperature and high humidity environment in the tropical zone of the Democratic Republic of Congo)
Usage: Mining area/campsite/base station/livelihood power supply
Core Category:
Photovoltaic modules: single/polycrystalline silicon modules (conversion efficiency meets the standard)
Energy storage system: lithium iron phosphate battery cabinet, energy storage integrated machine
Supporting equipment: MPPT controller, photovoltaic inverter, distribution box, cable, bracket, lightning protection grounding, monitoring system
Emergency category: portable photovoltaic energy storage power supply, mobile charging system
2. Core requirements
Brand: Legitimate big brand, stable quality, sufficient overseas performance
Compliance: Compliant with the import control and electrical safety standards of the Democratic Republic of Congo, with a complete set of documents including FERI, OCC, BIVAC inspection, UN38.3, MSDS, etc
Environment: High temperature resistant, dust-proof, corrosion-resistant, suitable for long-term outdoor operation
Service: including factory testing, export packaging, technical parameters, quality assurance plan, installation and commissioning guidance
3、 Suppliers need to submit materials
Business license, export registration, brand authorization
Product model, parameters, quotation, delivery time
Congo (Kinshasa) Compliance Certification and Testing Report (FERI/OCC/BIVAC/UN38.3/MSDS)
Performance case, quality assurance plan, packaging and transportation plan
4、 Compliance and Risk Warning
It is strictly prohibited to produce products without certification, non-compliance, or export procedures. Products that do not meet the requirements will be rejected
The battery is transported in accordance with hazardous material regulations, with complete documentation
The supplier shall bear full responsibility for the authenticity of certification, product quality, and customs compliance
5、 Contact information for docking
Contact unit: Purchasing Department of Mantu Mall
Contact phone number: 18616191127 (same WeChat account)
Data delivery email: mantuglobal@outlook.com
Docking time: 9:00-18:00 on weekdays